After a plant fault, PLC troubleshooting does not start at the programming device but with information: what exactly happened, when, how often, and what was changed most recently? A service provider who does not see the plant every day depends on these details. Without them, the first hours are lost to follow-up questions – or to searching in the wrong place.

This guide shows which information is particularly valuable after a fault, how to secure it with little effort and what to consider with remote access. Ideally, put together a short checklist before the next fault occurs – in an emergency there is rarely time for it.

Describe the fault

The most important information is an exact description of what was observed. “The machine does not work” leaves many possibilities open. “Station 2 stops in automatic mode after gripping, the gripper is closed, the panel shows lifting axis timeout” already narrows the search considerably. Describe what the plant should do, what it does instead and what state it is in.

It also helps to know what has already been tried: was the fault acknowledged, the machine restarted, a sensor cleaned, a part replaced – and with what result? Such details prevent the same steps from being repeated and often already point toward the cause.

  • Affected plant section, station or machine
  • Expected and actual behavior
  • Operating mode and the step in which the plant has stopped
  • Measures already taken and their result
  • Impact: standstill, limited operation or quality problem

Time and frequency

Whether a fault occurs once, occasionally or constantly fundamentally changes the troubleshooting approach. A permanent fault can be investigated directly at the plant. An intermittent fault needs patterns: does it occur at certain times of day, with certain products, after a shift change, in heat or cold, after long running times or after a restart?

Note the date and time of each occurrence as precisely as possible, together with the circumstances. Even a simple list over a few days often reveals connections that are not apparent from a single event. For intermittent faults, targeted recording of the signals involved also helps; our guide on how to record PLC signals explains how.

Message texts, alarm history and diagnostic buffer

The controller and the operator panels often know more than is shown on the screen. The exact wording of the fault message, including its number or identifier, is more valuable than a summary from memory. The alarm history of the operator panel shows which messages came in and in which order – often the first message is the decisive clue, not the last.

Many controllers also keep a diagnostic buffer or event log in which system events such as operating state changes, module faults or communication failures are stored with timestamps. Drives, fieldbus gateways and other devices have their own fault memories as well. Some of this information can be lost when devices are switched off and on again or faults are reset. Secure it beforehand whenever possible – a photo of the display is often enough.

  • Wording and identifier of the fault message
  • Alarm history with order and timestamps
  • Diagnostic buffer or event log of the controller
  • Fault memories of drives and fieldbus devices
  • Status LEDs on the controller, modules and network components

Photos, screenshots and videos

A picture saves many sentences. Photos of the status LEDs on the controller, I/O modules, bus couplers and drives show at a glance whether a device is reporting a fault or communication is missing. Screenshots or photos of the operator panel capture messages, process values and the current step. For mechanical anomalies – a part is misaligned, a cylinder does not extend fully – a short video often says more than any description.

Make sure the pictures show clearly what they are about: the device designation, the position in the control cabinet, the station on the plant. And before sending, check that no people, confidential documents or screens with data unrelated to the troubleshooting are visible.

Recent changes and program version

Changes are among the most common causes of new faults – changes to the plant, the program, parameters or the environment. Ask specifically: in the last few days or weeks, was anything rebuilt, a sensor or drive replaced, a parameter adjusted, software updated, a new product introduced? Changes to the network, the power supply or neighboring plants also count.

Equally important is the question of which program version is running on the controller and whether there is a current backup. If controller and project differ, this must be clarified before any change. Our guide on how to extend an existing PLC program explains how to deal with unclear program versions.

  • Mechanical or electrical modifications
  • Replaced devices, sensors, drives or modules
  • Changed parameters, recipes or program versions
  • Software updates on operator panels, PCs or network components
  • New products, materials or suppliers
  • Version and date of the last program backup

Remote access: only with approval and under control

Remote access can speed up troubleshooting considerably because the service provider can look at program, diagnostics and signals directly without traveling. However, it is an intervention in your network and your plant and should therefore only take place after explicit approval by the responsible people in your company – usually maintenance and IT together.

Clear rules have proven effective: access is only opened for the specific job and closed again afterward, each person logs in with their own account, and access is logged. Before any action that changes the plant – such as a program download, forcing variables or a restart – someone on site must be informed who can see the plant and confirm that it is safe to proceed. This applies in particular to anything that can trigger movement.

  • Approval by maintenance and IT
  • Access only for the duration of the job, personal login, logging
  • A contact person on site during access
  • Changes to the plant only after consultation and with eyes on the plant
  • Documentation of what was changed during access

Checklist for a fault report

The following list summarizes what a fault report should ideally contain. Not every item will always be available – rather send what you have quickly and add the rest later. For recurring faults, it is also worth setting up PLC alarm management so that the relevant information comes along automatically.

Existing customers of Arevano Engineering can reach us via the support form; we usually answer requests within one business day. Customers with an active service contract receive a separate emergency hotline.

  • Plant, location, contact person with phone number
  • Fault description: what was expected, what was observed, which state
  • Time, frequency and circumstances
  • Wording of messages, alarm history, diagnostic buffer
  • Photos of the operator panel, status LEDs and the affected plant section
  • Recent changes and program version
  • What has already been tried
  • Urgency: standstill, limited operation or monitoring
FAQ

Good to know.

As far as it is safe to do so: photos of the fault messages and status LEDs, the alarm history and, if accessible, the diagnostic buffer of the controller. Some of this information can be lost by switching off and on or by resetting.

Record each occurrence with date, time and circumstances and save the messages. If no pattern emerges, targeted recording of the signals involved helps, with a trigger that captures the decisive moment the next time the fault occurs.

Not always, but it can speed up troubleshooting considerably. The prerequisites are approval by maintenance and IT, time-limited and logged access, and a contact person on site who can observe and confirm any action on the plant.

Via the support form on our website; we usually answer requests within one business day. Critical faults related to existing contracts are handled with priority – please briefly note the urgency in your message. Customers with an active service contract receive a separate emergency hotline.
Next step

A fault at your plant?

Send us the fault description, messages and photos via the support form or write to us via the contact page. We reply personally, usually within one business day.